Before a construction surveyor starts any activity, thorough planning is carried out. Throughout the construction period a construction surveyor assists the work as necessary. As expected the construction surveyor conducts a construction survey which contributes an important piece to the whole construction project. The construction surveyor keeps watch on reference points and establishes markers which steer the construction of new installations.

So, what is Construction Survey? The following is a brief introduction of what a construction survey is. It is important that someone undertaking a construction project should get a gist of at least what it is and its significance to engineering projects.

A Construction Survey is basically a survey that presents locations and marks for construction activities; the process of executing evaluation and estimation prior to or during construction activities. It is carried out to layout engineering and construction works. Measurements are done for reference points which determine the location of the planned structure or improvements, vertical and horizontal positioning, dimensions, configuration, and to control the elevation of the new structures.

So we understand the overview and got the brief introduction, now let us understand the purpose of construction surveys.

The purpose of doing a construction survey is to maintain and establish the necessary vertical and horizontal control distinctions needed for a construction project. It includes taking measurements which is mandatory to ascertain quantities, and then put these measurements in documentation to corroborate the final payments made to the contractor.

Post construction, the survey is used to assess the final position and adequacy of the work, and to compute construction payments and be able to establish “as built” conditions. The “As Built” construction survey is conducted as the construction works are finished to verify the accomplishments as specified on the designs and plans.

Tasks that are involved in construction surveying are the following, pretty much how a construction surveyor do it:

Research, Reconnaissance, Control, and Mapping of the project area respectively are the tasks in this phase of an engineering project. This is a preliminary survey which is mainly the collection of data and establishing the survey control scheme that will be used during construction to “control” the position and elevation of each improvement. The result of this work is used for design, detailing of plans, and estimation of the project costs.

Gathering of the Design Data which include Project plans in digital and hard copies, Control Data (Vertical and Horizontal), Alignments (Vertical and Horizontal), New Roadway DTM, R/W data (with maps, descriptions and obligations), and Specifications.

Field Work includes Recovery of existing vertical and horizontal control, Augmentation and replacement of control stations that are necessary to control the construction project, Performing random checks of the vertical and horizontal control network, Checking Vertical controls as necessary, comparison of resultant coordinates to the original, collection of confidence points to check and validate the terrain model, condition documentation, and performing utility relocation surveys as necessary.


construction surveyorFinally, here is an illustrated example of how a complete Construction Survey looks. The final piece that is presented after the tedious measurements and markings is a topographic survey map which includes all of the vital features illustrated with the contours that represents the elevations.

 

 

 

 

 

How to Choose a Reliable Construction Surveyor

In order for any construction project to be successful, a good construction surveyor should be in on the construction process from start to finish. And, prior to hiring the construction surveyor, you must ensure that he possess adequate skills and is capable of dealing with the complexities of the job. Below are some of the essential things to be considered in order to ensure that your construction surveyor is qualified:

1. A construction surveyor must have experience on similar construction projects.

The main purpose of a construction surveyor involves getting accurate and efficient measurements to ensure that constructed objects are in the correct location on the site. In order to ensure that you are relying on the right person, it is not enough to merely check his license (and you should always insist on a licensed construction surveyor) but, you must verify that the surveyor has experience on construction sites and that he/she can think on their feet. Situations change very quickly on a construction site and your construction surveyor should be able to adapt.

2. A construction surveyor must know how to deal with other professionals

Construction surveyors advise contractors, engineers and other professionals while the process of construction is ongoing. While communication is important in most jobs, it is especially so on a construction site. The construction surveyor must have a wide range of knowledge in what the other professionals on the site are doing. This understanding of the job and what is required of the other professionals helps the construction surveyor to anticipate the needs of the other members of the development team. Sometimes there are also competing interests on a site. For example, the curbing contractor might be different than the paving contractor. Differing grades on the curbing can cost the paving contractor a significant amount of money. This situation can lead to a lot of finger pointing. A diplomatic construction surveyor can smooth out some of these conflicts.

construction surveyor3. A construction surveyor must have keen attention to details

Even the slightest errors in major construction projects are magnified by the time the project is completed. This usually translates to significant sums of money. This is the reason why the construction surveyor must ensure great precision in calculating points and in providing instructions. For instance, if an existing building is being expanded, it is extremely important to check the exact location of the building before the addition is begun. This is one of the most common errors in a building addition project.

4. He must be used to multi-tasking

A construction surveyor’s task involves a lot of demands. These demands include initially collecting information regarding the existing site, comparing these existing site conditions to the plans and previous surveys, and preparing to and staking out multiple site improvements. These site improvements may be for multiple contractors, who all make the requests at the same time. Again, it is common for mistakes to happen at this time because of the construction surveyor possibly rushing the work to satisfy everyone. And, as stated above, site conditions change suddenly which requires sudden alterations in the project and in coming up with an immediate response or an appropriate remedy. Upon the completion of the project, the construction surveyor checks whether or not the resulting work has been built according to the plans.

Overall, a construction surveyor’s job demands a lot of knowledge, time, skill and energy. Thus, it would be very useful hiring someone with all the aforementioned qualities just to ensure that you are safely leaning on the right person. Moreover, it would be wiser to hire someone who is well-experienced especially in dealing with major construction projects in order to assure success.

If you are looking for a reliable and highly qualified construction surveyor for your Construction Surveying need or other Land Surveying Services, Please call Lafayette Land  Surveying at (334) 234 9946 or better yet, fill out our contact request form